Umbrella Parking Shade

CAR PARKING SHADES • RIYADH • SAUDI ARABIA

Umbrella Parking Shade

A compact central-support canopy designed for individual or grouped parking bays.

System overview and suitable applications

Umbrella parking shades use a central column and radial roof structure. Modules can be repeated in an organized layout and adapted to parking counts, boundaries and circulation.

Best Suited For

Villas, offices, schools, small parking courts, visitor bays and landscaped properties.

Design Advantage

Compact footprint, symmetrical appearance and modular expansion.

Customization

Dimensions, column positions, roof profile, membrane color, steel finish and accessories can be coordinated around the approved site layout.

Typical construction specification

ElementTypical OptionsProject Review
Primary StructureCentral steel column, radial arms, perimeter frame, bracing and connection plates.Member sizes and thicknesses are finalized according to span, geometry, loads and approved engineering scope.
Shade CoverPVC/PVDF membrane or HDPE fabric shaped and tensioned around the radial frame.UV performance, tensile strength, waterproofing, fire rating, color and warranty are reviewed.
Steel ProtectionHot-dip galvanizing, epoxy system, powder coating or project-approved paintSelected for corrosion exposure, appearance and maintenance.
ConnectionsFabricated plates, bolts, welds, tensioning hardware and accessoriesCoordinated for structural load path, erection and service.
Foundation InterfaceBase plates, anchor bolts and concrete foundations, or approved existing supportsReactions, soil/site condition, embedment, edge distances and drainage are considered.

Engineering and fabrication requirements

Site & Layout

Dimensions, clear heights, access, boundaries and obstacles are verified before final design.

Structural Coordination

Dead load, wind, uplift, members, connections, base plates, anchors and foundation reactions are reviewed as required.

Fabrication Control

Cutting, fit-up, welding, dimensions, surface preparation, coating and identification are checked before dispatch.

Installation methodology

  1. Confirm setting-out points, access, utilities and approved foundations.
  2. Complete foundations or verify approved supports and anchors.
  3. Erect members with controlled lifting, temporary stability and alignment.
  4. Complete connections, bolting and coating touch-ups.
  5. Fit and tension the membrane or roof system in the approved sequence.
  6. Inspect alignment, coating, connections, tension, drainage and site condition.
  7. Close snags and complete agreed handover documentation.

Maintenance and warranty guidance

Periodic inspection should cover membrane condition, seams, hardware, connections, coating damage, corrosion, anchors and drainage. Warranty coverage depends on the approved manufacturer, material system, workmanship scope, exposure and contract conditions.

Project note: Final section sizes, grades, coating, foundations and performance criteria follow approved project-specific documents.

Request a quotation for Umbrella Parking Shade

Send location, dimensions, quantity, drawings and required schedule.

Discuss This Product