CAR PARKING SHADES RIYADH • ENGINEERING • FABRICATION • INSTALLATIONSaudi Arabia • info@carparkingshaderiyadh.com • +966 59 650 0167
PERGOLA SYSTEM 05 • RIYADH & ALL KSA

Wood-Finish Aluminium Pergola

The strength and low maintenance of aluminium combined with a premium wood-look architectural finish.

Custom DesignPROJECT-SPECIFIC LAYOUT*
Saudi ClimateMATERIAL SELECTION
All KSASUPPLY & INSTALLATION
Home›Products›Pergola Shades›Wood-Finish Aluminium Pergola
SYSTEM OVERVIEW

Wood-Finish Aluminium Pergola engineered for its actual setting.

The strength and low maintenance of aluminium combined with a premium wood-look architectural finish.

Villas, resorts, restaurants, gardens, pool areas and hospitality projects requiring a warm natural appearance.

Wood-look finish code, texture, gloss, UV durability and touch-up limitations must match the approved sample.

Every proposal is coordinated with verified dimensions, support locations, clear height, access, drainage, lighting, utilities, finishes and the client-approved architectural intent.

DESIGN VIEWS

Architecture, roof system and construction details.

Verified project photographs can replace these design placeholders when supplied.

*Illustrative layout only. Final geometry follows approved drawings.

TECHNICAL SPECIFICATION

Materials, structure and interfaces defined before production.

Exact grades, sections, brands and performance values follow the approved quotation, submittal and drawings.

Primary StructureExtruded aluminium posts, beams and louvers finished with an approved wood-grain powder coating or sublimation system.Member sizes follow approved geometry, loading, deflection limits and support conditions.
Roof SystemProduct-specific louvers, slats, retractable fabric, PVC/PVDF membrane or mixed architectural roofing as selected.Weather protection, ventilation, solar control, fire data, UV performance and maintenance requirements are reviewed.
MaterialsProject-approved aluminium alloy/temper, structural steel, stainless hardware and membrane or fabric grade.Certificates, samples and manufacturer data are provided where included in scope.
FinishPowder coating, wood-look finish, hot-dip galvanizing plus compatible epoxy/top coat, or approved paint system.Color, gloss, texture, preparation and coating thickness follow the approved finish schedule.
ConnectionsEngineered brackets, plates, bolts, welds, anchors, profiles, seals and roof-system hardware.Details coordinate tolerance, thermal movement, waterproofing and installation access.
DrainageRoof falls, perimeter gutters, channels, outlets and downpipes as applicable.Discharge points must coordinate with the building and site drainage plan.
Foundation / HostNew foundations or verified existing concrete/steel supports.Structural capacity, anchors, edge distances, waterproofing and utilities require verification.
Wind & ExposureProject-specific wind, uplift, rain, heat and corrosion criteria.Final criteria must be confirmed before engineering approval and fabrication.
Engineering note: Standard catalogue sizes do not replace project-specific checks. Span, height, roof position, wind exposure and support capacity can change member sizes, anchors and foundations.
COVER & FINISH OPTIONS

Performance matched to the project.

Click any material option to review its complete specification, benefits, applications and project-selection points.

01 · MEMBRANE SYSTEM

PVC / PVDF Membrane

Premium coated architectural membrane with a clean finish and waterproofing capability when the approved system is correctly detailed.

CLICK FOR COMPLETE DETAILS →

What is PVC/PVDF membrane?

A polyester base fabric is coated with PVC for strength and weather protection, then finished with a PVDF surface layer to improve cleanability, color retention and resistance to dirt and environmental exposure. Product composition varies by manufacturer and approved grade.

Key performance benefits

  • Suitable for waterproof parking canopies when seams, slopes, edges and drainage are correctly engineered.
  • Strong architectural appearance with smooth tensioned surfaces and multiple color options.
  • Project grades can be selected for UV resistance, tensile strength, fire classification and warranty requirements.
  • Heat-welded or approved fabricated seams help create continuous membrane panels.
  • Can be tensioned over cantilever steelwork using project-approved plates, cables, profiles and hardware.
BASEHigh-tenacity polyester fabric
COATINGPVC with PVDF surface finish
WEATHERWaterproof system where properly detailed
SELECTIONGSM, tensile, fire, UV and warranty by approved datasheet

Best suited for

Commercial parking, corporate facilities, hospitals, schools, industrial sites and premium villa projects requiring a refined, weather-protective membrane finish.

Final brand, GSM, tensile strength, fire rating, UV data, color and warranty must match the approved manufacturer datasheet and project submittal.
02 · BREATHABLE SHADE CLOTH

Knitted HDPE

Breathable shade cloth focused on solar/UV reduction, heat ventilation and practical large-area coverage.

CLICK FOR COMPLETE DETAILS →

What is knitted HDPE?

HDPE shade cloth is manufactured from high-density polyethylene yarn in a knitted construction. It reduces direct solar exposure while allowing air movement and controlled rain penetration, helping heat escape from below the canopy.

Key performance benefits

  • Breathable construction supports natural ventilation beneath parked vehicles.
  • Practical for villa, school, employee, commercial and large parking areas.
  • Available in different shade factors, GSM weights, colors and manufacturer warranty levels.
  • Flexible fabric can be shaped and tensioned for cantilever, pyramid, sail and other systems.
  • Generally lighter and more economical than coated waterproof membrane systems.
MATERIALUV-stabilized knitted HDPE yarn
COMMON RANGEProject-selected GSM; 325/340 GSM may be specified
VENTILATIONBreathable and heat-release focused
RAINNot normally a fully waterproof membrane

Important fire and UV note

UV block percentage, shade factor, tensile properties and warranty must come from the selected manufacturer’s certified datasheet. Standard knitted HDPE should not be described as fire-retardant unless the exact approved product has a valid fire-test classification.

For a 325 GSM product, ignition time, after-flame, flame spread and self-extinguishing behavior require an applicable laboratory report; they must not be assumed from GSM alone.
03 · HIGH-PERFORMANCE MEMBRANE

PTFE Membrane

Premium architectural membrane option for selected projects requiring enhanced durability, cleanability and specification compliance.

CLICK FOR COMPLETE DETAILS →

What is PTFE membrane?

PTFE architectural membrane commonly uses a woven glass-fibre base coated with polytetrafluoroethylene. It is specified for demanding tensile structures where long-term surface stability, fire performance and premium architectural quality are priorities.

Key performance benefits

  • High resistance to UV exposure, weathering and many environmental contaminants.
  • Low-surface-energy finish helps reduce dirt adhesion and supports easier cleaning.
  • Suitable for large and prestigious architectural projects subject to approved engineering.
  • Selected systems can provide strong fire-performance classifications.
  • Stable premium appearance with controlled translucency depending on product grade.
BASETypically woven glass fibre
COATINGPTFE architectural coating
APPLICATIONPremium tensile and long-life structures
APPROVALBrand-specific technical and fire certificates

Project considerations

PTFE requires specialist patterning, fabrication, packaging, installation and tension control. It is generally a higher-cost solution than HDPE or PVC/PVDF and should be selected with the consultant and approved manufacturer.

All durability, fire, translucency and warranty claims must be taken from the exact approved PTFE membrane system—not from a generic PTFE description.
04 · STEEL PROTECTION SYSTEM

HDG + Epoxy Steel

Corrosion-protection option combining hot-dip galvanizing with an approved epoxy/top-coat system where project conditions require it.

CLICK FOR COMPLETE DETAILS →

How the duplex protection works

After fabrication and required inspection, structural steel is hot-dip galvanized to provide a zinc protective layer. Where specified, compatible surface preparation and an approved epoxy/intermediate/top-coat system are then applied to achieve the required color and additional environmental protection.

Quality-control points

  • Steel grade, weld quality and fabricated dimensions checked before finishing.
  • Galvanizing preparation includes vent/drain detailing and surface condition review.
  • Galvanizing thickness and coating system verified against the approved specification.
  • Compatible preparation is required before applying epoxy over galvanized steel.
  • Site damage, cut edges and installation touch-ups follow the approved repair procedure.
PRIMARY LAYERHot-dip galvanized zinc protection
COATINGApproved compatible epoxy/top coat
COLORProject-approved RAL or finish schedule
INSPECTIONVisual, thickness and repair checks as specified
The final surface-preparation method, dry-film thickness, number of coats and inspection acceptance criteria must follow the approved project coating specification.
ENGINEERING REVIEW

Designed around the actual site—not a generic product sketch.

Click each stage to review its inputs, engineering checks and typical project deliverables.

01 · SITE INPUTS

Site & Layout

Parking-row geometry, column zone, clear height, traffic access, utilities, drainage and foundations.

Information reviewed before design

The Custom Multi-Bay system depends on coordinated canopy dimensions, support locations, canopy profile and primary-member geometry, membrane slopes, edge conditions and vehicle clearance. The review checks whether columns and foundations fit the approved parking plan without affecting vehicles, pedestrian routes, drainage, lighting or underground services.

  • Bay width and depth, vehicle class, row arrangement and total quantity.
  • Support zones, canopy elevations, primary-member lengths, membrane edge levels and module spacing, clear height and canopy projections.
  • Traffic aisles, kerbs, walkways, ramps, boundaries and emergency access.
  • Existing utilities, lighting, drainage, landscaping and obstruction zones.
  • Foundation feasibility, soil information and restrictions on excavation.
  • Crane, delivery, storage and installation access.
Site measurement / survey informationParking layout and column setting-outClearance and obstruction reviewFoundation-location coordination
Final dimensions must be verified at site or against an approved client layout before fabrication.
02 · LOAD PATH

Structural Design

Balanced and unbalanced wind, uplift, members, connections, base plates, anchors and reactions.

Project-specific structural coordination

Membrane pretension, primary members, connection nodes and support columns transfer gravity, wind and uplift through the selected columns, connections, base plates, anchors and foundations. The design considers dead load, membrane pretension, wind pressure, suction, uplift, bending and connection demands for the approved geometry.

  • Design basis, applicable code, wind speed and exposure category.
  • Dead load, membrane pretension, wind pressure, suction and uplift combinations.
  • Deflection, stability and behavior of columns, primary members, connections and support columns, beams and bracing.
  • Welds, bolts, plates, stiffeners and membrane connection points.
  • Base plate, anchor-bolt forces and project foundation reactions.
  • Foundation design where soil data and scope are provided.
Design criteria and calculation report*Member and connection checks*Base plate / anchor-bolt checks*Foundation reactions or design*
155 KPH and 190 KPH are separate design conditions. Higher wind criteria may require heavier steel, larger plates, anchors and foundations. Engineering deliverables marked * follow the agreed quotation scope.
03 · APPROVAL PACKAGE

Technical Submittal

Shop drawings, material data, samples, certificates, coating details and warranty documents as agreed.

Documents prepared for review

The submittal converts the approved commercial concept into coordinated information for the client, consultant, procurement and production teams. The exact package depends on the project requirement and contracted scope.

  • General arrangement, dimensions, elevations, sections and setting-out.
  • Steel fabrication details, connections, base plates and anchor layout.
  • Membrane material datasheet, color/sample, UV, tensile and fire information.
  • Steel grade, fastener, welding and coating/galvanizing documentation.
  • Material certificates, COC, manufacturer warranty and test reports where required.
  • Method statement, ITP, lifting plan and project-specific supporting documents.
AutoCAD / shop drawingsMaterial approval request (MAR)Datasheets and certificatesMethod statement / ITP / lifting plan
Only the approved brand and exact product datasheet should be used for performance, fire and warranty claims.
04 · CONTROL & SAFETY

QA/QC & HSE

Inspection points for fabrication, coating, delivery, erection, membrane tension and final handover.

Inspection and safe-delivery controls

Quality and safety checks are coordinated from material receipt through fabrication, coating, transport, erection and final membrane installation. Project hold/witness points follow the approved ITP and client requirements.

  • Material identification, dimensional inspection and traceability where required.
  • Cutting, fit-up, weld quality and fabrication tolerance checks.
  • Surface preparation, galvanizing/coating thickness and repair inspection.
  • Delivery condition, component identification and safe lifting arrangements.
  • Column alignment, bolt tightening, temporary stability and connection completion.
  • Membrane seams, hardware, tension, drainage, finish and snag closure.
Inspection requests and checklistsWelding / coating inspection recordsJSA, toolbox talk and lifting controlsFinal inspection and handover record
HSE documentation and inspection records are adapted to the actual site, client procedure and installation method.
SUITABLE APPLICATIONS

Outdoor spaces planned for comfort and architectural value.

Villas, resorts, restaurants, gardens, pool areas and hospitality projects requiring a warm natural appearance.

01

Villas

Terraces, gardens, entrances and pool areas.

02

Hospitality

Hotels, resorts, restaurants and cafés.

03

Commercial

Retail, offices and customer-facing terraces.

04

Education

Schools, campuses and gathering areas.

05

Public Realm

Parks, walkways and community spaces.

06

Custom Projects

Site-specific architectural shade requirements.

DELIVERY PROCESS

From site information to final handover.

Click each stage to review the work scope. Programme depends on approved drawings, material availability, site readiness and the confirmed project scope.

01 · PROJECT INPUTS

Requirement

Location, dimensions, quantity, vehicle types, shade preferences and available project documents.

Information required to define the project

The enquiry starts with enough verified information to select a suitable Custom Multi-Bay layout and prepare a responsible proposal.

  • Project location, site access and client/consultant contact details.
  • Parking-bay dimensions, total quantity, row arrangement and vehicle types.
  • Required clear height, shade projection, column position and architectural preference.
  • Preferred PVC/PVDF, HDPE or PTFE membrane and required steel finish.
  • Site photographs, drawings, survey, BOQ, specifications and authority requirements where available.
  • Required completion date, working hours and any operational restrictions.
Final measurements must be verified at site or against approved project drawings before fabrication.
02 · DESIGN & APPROVAL

Engineering

Site layout, design criteria, structural checks, shop details and required approvals.

Engineering coordination

  • Coordinate parking layout, column setting-out, clearances, drainage, utilities and access.
  • Confirm design basis, applicable code, exposure and project-specific wind criterion.
  • Check members, deflection, connections, welds, bolts, base plates, anchors and reactions.
  • Coordinate 155 KPH or 190 KPH design condition when specified in the agreed scope.
  • Prepare calculations where contracted, shop drawings, material submittals and approval revisions.
  • Provide foundation reactions or foundation design according to soil data and contracted responsibility.
EXPLORE ENGINEERING →
No generic section size or foundation detail should replace approved project-specific engineering.
03 · CONTROLLED PRODUCTION

Fabrication

Material receipt, cutting, fit-up, welding, dimensional checks, finishing and identification.

Factory production sequence

  • Receive and identify approved steel, plates, fasteners, membrane and accessories.
  • Cut and prepare columns, arms, beams, braces, plates and connection components.
  • Control fit-up, welding sequence, dimensional tolerances and required inspection points.
  • Complete galvanizing, compatible epoxy/top coat, powder coating or specified paint system.
  • Check finish condition, coating thickness and approved repair/touch-up requirements.
  • Mark, protect, package and load components in the planned installation sequence.
VIEW FACTORY & FABRICATION →
04 · SITE EXECUTION

Installation

Setting-out, foundation verification, controlled erection, alignment and membrane tensioning.

Installation and erection activities

  • Verify approved setting-out, foundation levels, anchor positions, access and work permits.
  • Coordinate delivery, unloading, lifting plan, exclusion zones and temporary stability.
  • Erect columns and cantilever framing in the approved sequence.
  • Check line, level, plumb, connection completion and specified bolt tightening/torque.
  • Repair approved coating damage and protect completed steelwork.
  • Install membrane panels, edge hardware and drainage details; apply controlled final tension.
DISCUSS INSTALLATION SCOPE →
Actual erection method, equipment and safety controls are adapted to the approved site conditions and project method statement.
05 · COMPLETION & RECORDS

Inspection

Connections, alignment, coating, membrane seams, tension, drainage, snags and handover.

Final QA/QC and handover review

  • Inspect structural alignment, completed weld/bolt connections and accessible anchor interfaces.
  • Review galvanized/coated surfaces, site repairs, finish quality and visible damage.
  • Check membrane seams, attachment hardware, tension, edge finish and water-shedding details.
  • Confirm clearance, drainage path, housekeeping and safe removal of temporary controls.
  • Record and close punch-list or snag items according to the agreed acceptance procedure.
  • Compile available inspection records, approvals, warranties and handover documents within scope.
VIEW QUALITY, QA/QC & HSE →
Inspection hold points, records and handover deliverables follow the approved ITP, client requirements and contracted scope.
FREQUENTLY ASKED QUESTIONS

Wood-Finish Aluminium Pergola FAQs.

Final answers depend on site conditions and the approved product system.

Is this pergola custom-made?

Yes. Dimensions, supports, roof type, drainage, color, accessories and interfaces are developed for the actual project.

Is the roof waterproof?

Only systems specifically designed and approved as waterproof should be described that way. Louvers, membranes, seals, slopes and drainage must be detailed as one system.

Which frame material is recommended?

Aluminium offers low weight and corrosion resistance; structural steel suits larger spans and custom fabrication. Final selection depends on design, exposure and budget.

Can lighting or automation be added?

Yes, when coordinated before fabrication. Electrical load, IP rating, wiring routes, control access and supplier requirements must be confirmed.

How is drainage handled?

Roof falls, gutters, channels, outlets and downpipes are coordinated with the building or site discharge points.

What warranty is available?

Coverage depends on the approved frame, finish, roof-system manufacturer, motors, workmanship, exposure and contract terms.

Do you supply across Saudi Arabia?

Yes. Site survey, engineering, fabrication and installation can be coordinated in Riyadh and across Saudi Arabia.

RELATED PERGOLA SYSTEMS

Compare alternative outdoor shade systems.

Select according to use, weather protection, architecture and operation.

Request a project-specific Wood-Finish Aluminium Pergola proposal.

SEND PROJECT REQUIREMENT →