QA/QC

CAR PARKING SHADES RIYADH • SHADE ENGINEERING • FABRICATION • INSTALLATION Saudi Arabia • info@carparkingshaderiyadh.com • +966 59 650 0167
CAR PARKING SHADES RIYADH · QUALITY ASSURANCE & QUALITY CONTROLQA/QC PROJECT CENTER
QUALITY · INSPECTION · TRACEABILITY · RECORDS

Quality is not
the final check.
It is the process.

From incoming project materials to fabrication, installation and final handover, quality activities are planned around approved project requirements, inspection points and documented records.

01CONTROLRequirements & inputs
02INSPECTWorkmanship & stages
03RECORDEvidence & handover
QUALITY PRINCIPLEPlan · Inspect · Record · CloseProject-specific QA/QC workflow
QA
QC
01 · QUALITY FRAMEWORK

Four controls behind
a reliable project.

The page focuses on how project quality is controlled — without repeating the fabrication, product or downloads pages.

01REQUIREMENT CONTROL

Build to the
approved basis.

Project drawings, specifications, material requirements and applicable inspection criteria form the quality reference.

02MATERIAL CONTROL

Verify before
use.

Incoming materials and available supporting documents are checked against project requirements as applicable.

03PROCESS CONTROL

Inspect during
execution.

Defined fabrication and installation stages are checked rather than relying only on a final visual inspection.

04RECORD CONTROL

Close with
evidence.

Applicable inspection, material and handover records are organized for project closeout.

02 · QA/QC PROJECT JOURNEY

Quality gates from
material to handover.

A compact inspection journey showing where QA/QC fits into the real project lifecycle.

01RECEIVING

Material Receiving

Identity, condition, quantity and required supporting records.

02STEEL

Steel Verification

Sections, dimensions and project-required material checks.

03FABRICATION

Dimensional QC

Cutting, fit-up, geometry and fabrication checks.

04WELDING

Welding Inspection

Applicable workmanship and project inspection requirements.

05FINISH

Surface Protection

Specified coating / galvanizing related verification.

06MEMBRANE

Fabric Inspection

Material identity, fabrication condition and relevant details.

07PRE-DISPATCH

Release Check

Components and required records before dispatch.

08SITE

Installation QC

Position, alignment, connections and agreed site checks.

09FINAL

Final Inspection

Completion status and outstanding observations.

10CLOSEOUT

Handover Records

Applicable quality records assembled for project closure.

03 · INSPECTION & TEST PLAN

Define the check
before the work.

Project ITP requirements can identify inspection stages, acceptance references, responsible parties and client/consultant involvement where required.

PROJECT QUALITY PLANInspection points linked to project requirements.
STAGECONTROLPOINT
01Incoming material verificationR
02Fabrication / dimensional inspectionW
03Welding / workmanship inspectionW
04Surface finish verificationR
05Pre-dispatch / release inspectionH*
06Site installation inspectionW
07Final / handover inspectionH*
* Hold, witness and review points are project-specific and should be agreed in the applicable ITP.
04 · WHAT WE CONTROL

Inspection by
technical discipline.

Focused quality cards make it easy for clients and consultants to understand the control areas without duplicating full engineering content.

STEEL

Material & Dimensions

Specified sections, component dimensions, identification and fabrication condition as applicable.

VIEW CONTROL POINTS →
WELDING

Fit-up & Workmanship

Joint preparation, visual workmanship and applicable project inspection requirements.

VIEW CONTROL POINTS →
FINISH

Coating / Galvanizing

Specified surface-protection system and available project-required verification records.

VIEW CONTROL POINTS →
FABRIC

Membrane / Covering

Specified material identity, condition, fabrication and relevant supporting documentation.

VIEW CONTROL POINTS →
SITE

Installation Checks

Location, alignment, assembly, connections and agreed installation inspection points.

VIEW CONTROL POINTS →
FINAL

Completion & Closeout

Final observations, punch items where applicable and project quality record compilation.

VIEW CONTROL POINTS →
05 · MATERIAL TRACEABILITY

Know what was
approved and used.

Where the project requires traceability, material information and supporting documents can be linked to the approved project submittal and relevant inspection records.

01Material identification
02Approved submittal reference
03Supplier / manufacturer documentation
04Receiving / inspection record
05Project usage / release reference
MATERIAL
SUBMITTAL
INSPECTION
PROJECT
TRACE
CHAIN
06 · NONCONFORMANCE CONTROL

Find it. Record it.
Correct it. Close it.

When a nonconforming condition is identified, the quality workflow should make the issue visible and drive documented disposition and closure.

01IDENTIFY

Observation / NCR

Record the nonconforming condition.

02CONTROL

Segregate / Hold

Prevent unintended use where applicable.

03REVIEW

Disposition

Define the appropriate approved action.

04CORRECT

Action

Complete the required correction.

05VERIFY

Reinspection

Confirm the completed action.

06CLOSE

Record Closure

Maintain the applicable closure record.

07 · QA/QC DOCUMENTATION

Quality that can
be documented.

Document availability and exact formats depend on the project scope, approved requirements and applicable manufacturer/supplier records.

PLAN

ITP / Inspection Plan

Project inspection stages and agreed points.

MATERIAL

Certificates / COC

Applicable supplied material or conformity records.

INSPECTION

Inspection Records

Applicable fabrication or site quality records.

TECHNICAL

Approved References

Relevant approved drawings / specifications.

CLOSEOUT

NCR / Punch Closure

Applicable quality observations and closure evidence.

HANDOVER

Quality Dossier

Compiled applicable records for project handover.

CLIENT / CONSULTANTInspection coordination where the project requires it.
08 · CLIENT & CONSULTANT INTERFACE

Quality control
with clear visibility.

Where specified, project inspections can include agreed review, witness or hold points with the relevant client or consultant representatives.

RREVIEWDocument / record review point
WWITNESSInspection attendance as agreed
HHOLDWork does not proceed until required release
Exact inspection involvement is defined by the approved project ITP and contract requirements.
09 · FINAL QUALITY CLOSEOUT

Inspection ends.
Traceable records remain.

At project completion, applicable quality evidence can be organized around final inspection, outstanding-item closure and handover requirements.

01FINAL INSPECTION
02PUNCH / OBSERVATIONS
03CORRECTION & VERIFICATION
04DOCUMENT COMPILATION
05QUALITY HANDOVER
10 · PROJECT-SPECIFIC QA/QC

Have a consultant
quality requirement?

Send the project specification, ITP requirement, submittal list or inspection requirement for review against the proposed project scope.

QUALITY REQUIREMENT DESK

Send your QA/QC requirement

UPLOAD DOCUMENTSpecification · ITP · Checklist · Submittal List

SUBMIT TECHNICAL REQUIREMENT →CONTACT QA/QC TEAM →
CAR PARKING SHADES RIYADH · QA/QC

Controlled work.
Documented quality.

From project requirements through inspection and handover, keep quality visible at every critical stage.

EXPLORE QA/QC SYSTEM →